targets: accept animated M2 materializer
This commit is contained in:
@@ -224,6 +224,9 @@ Runtime и Editor используют facade; planner/scheduler тестиру
|
||||
proprietary ADT probe remained unavailable. Documentation and coordination
|
||||
gates passed; internal-access inventory remains `30` while the loader adapter
|
||||
now retains only diagnostic formatting and Editor ownership for this batch.
|
||||
Post-merge materializer (`13.719ms`), playback/finalizer, shutdown, facade,
|
||||
internal-access `30`, checkpoint dry-run `7/7`, documentation and coordination
|
||||
gates remained green.
|
||||
M02 terrain-query regression
|
||||
remained green (13 pre-existing expired M00 claim warnings).
|
||||
- Fidelity comparison: all 16 historical operation limits and drain sites were
|
||||
|
||||
Reference in New Issue
Block a user