diff --git a/coordination/claims/M03-RND-M2-MESH-RESOURCE-FINALIZER-001.md b/coordination/claims/M03-RND-M2-MESH-RESOURCE-FINALIZER-001.md index 443435a..5c2f494 100644 --- a/coordination/claims/M03-RND-M2-MESH-RESOURCE-FINALIZER-001.md +++ b/coordination/claims/M03-RND-M2-MESH-RESOURCE-FINALIZER-001.md @@ -58,9 +58,9 @@ loader into one dedicated finalization service. ## Status -- State: ready +- State: accepted - Done: implementation, verification and documentation -- Next: merge and post-merge acceptance +- Next: next unclaimed M03 renderer extraction package - Blocked by: ## Handoff @@ -77,3 +77,8 @@ loader into one dedicated finalization service. - Documentation updated: new full module specification with API/I/O and data-flow/state/sequence/dependency diagrams; adjacent M2 module specs, world-renderer registry/spec, `RENDER.md` and M03 Evidence. +- Merge: `34b7000` (`merge: M2 Mesh resource finalizer`) +- Post-merge: finalizer PASS `cases=31 iterations=1000 elapsed_ms=0.826`; + adjacent M2 pipeline/cache/extractor/runtime/repository/prototype/shutdown, + facade, internal-access `30`, manifest `7/7`, documentation `46` and + coordination gates passed. diff --git a/targets/03-renderer-facade.md b/targets/03-renderer-facade.md index 4268700..1095ea8 100644 --- a/targets/03-renderer-facade.md +++ b/targets/03-renderer-facade.md @@ -27,7 +27,7 @@ Runtime и Editor используют facade; planner/scheduler тестиру ## Evidence - Date: 2026-07-18 -- Revision/worktree: master merges `7ece2ab`, `7e35de7`, `80cb084`, `d6e5b53`, `c69abd6`, `606770c`, `630a0c1`, `f36fabb`, `24aef13`, `2342430`, `396be5e`, `f88bf97`, `3f84717`, `d2cb52f`, `f9e5a4f`, `c06aed5`, `a878e7c`, `60603e1`, `b4955d6`, `ada0fd9`, `f470775`, `874fd0f`, `38f831e`, `83b3618`, `3094561`, `fa85985`, `1fafdde`, `7cd07dd`, `1de50f9`, `3dccd3e`, `e7a7c67`, `c0fc191`, `c251985`, `5e82daa`, `1dc013e`, `99a90dd`, `4354834`, `a043c79`, `f79e064`, `d37c799`, `06f6394`; +- Revision/worktree: master merges `7ece2ab`, `7e35de7`, `80cb084`, `d6e5b53`, `c69abd6`, `606770c`, `630a0c1`, `f36fabb`, `24aef13`, `2342430`, `396be5e`, `f88bf97`, `3f84717`, `d2cb52f`, `f9e5a4f`, `c06aed5`, `a878e7c`, `60603e1`, `b4955d6`, `ada0fd9`, `f470775`, `874fd0f`, `38f831e`, `83b3618`, `3094561`, `fa85985`, `1fafdde`, `7cd07dd`, `1de50f9`, `3dccd3e`, `e7a7c67`, `c0fc191`, `c251985`, `5e82daa`, `1dc013e`, `99a90dd`, `4354834`, `a043c79`, `f79e064`, `d37c799`, `06f6394`, `34b7000`; packages `M03-RND-SCHEDULER-001`, `M03-RND-INTERNAL-ACCESS-GATE-001`, `M03-RND-FACADE-GROUND-QUERY-001`, `M03-RND-FACADE-ENVIRONMENT-001`, `M03-RND-FACADE-ENTITY-001`, `M03-RND-TERRAIN-CACHE-SERVICE-001`, @@ -325,6 +325,9 @@ Runtime и Editor используют facade; planner/scheduler тестиру headless regressions passed; internal-access remained `30`, documentation covered `46` module specifications, coordination retained `34` historical expired-claim warnings and checkpoint dry-run kept all `7/7` plans. + Merge `34b7000` passed post-merge finalizer (`0.826ms`), Mesh pipeline/cache/ + extractor/runtime-finalizer/raw-repository/prototype/shutdown, facade, + internal-access `30`, manifest `7/7`, documentation `46` and coordination. M02 terrain-query regression remained green (13 pre-existing expired M00 claim warnings). - Fidelity comparison: all 16 historical operation limits and drain sites were