docs(M01): claim milestone closeout #20
@@ -1,6 +1,7 @@
|
||||
# M01-QAR-INTEGRATOR-CLOSEOUT-001 — M01 milestone closeout
|
||||
|
||||
<!-- OPENWC_CLAIM:M01-QAR-INTEGRATOR-CLOSEOUT-001:sindo-main-codex:2026-07-16 -->
|
||||
<!-- OPENWC_HANDOFF:READY:M01-QAR-INTEGRATOR-CLOSEOUT-001:dd412e6 -->
|
||||
|
||||
## Ownership
|
||||
|
||||
@@ -67,7 +68,34 @@ criteria pass.
|
||||
|
||||
## Status
|
||||
|
||||
- State: active
|
||||
- Done: confirmed seven M01 READY commits are ancestors of current master
|
||||
- Next: run post-merge gates, audit docs/evidence and prepare transition
|
||||
- State: ready-for-review
|
||||
- Done: accepted seven M01 packages, reran post-merge gates, recorded complete
|
||||
target Evidence, closed M01 and activated M02
|
||||
- Next: merge closeout commit before starting an M02 implementation claim
|
||||
- Blocked by:
|
||||
|
||||
## Handoff
|
||||
|
||||
- Commit: `dd412e6`
|
||||
- Branch: `work/sindo-main-codex/m01-integrator-closeout`
|
||||
- Outcome: M01 is `DONE` with all seven checklist items and complete Evidence;
|
||||
M02 is the only `ACTIVE` target and `targets/README.md` points to it.
|
||||
- Integration audit: all seven M01 READY commits are ancestors of master
|
||||
`c8e99f2`; their claims now carry `OPENWC_INTEGRATION:ACCEPTED` markers.
|
||||
- Verification: unified renderer dry-run passed project load, material/dedupe/
|
||||
shutdown gates, manifest `7/7/7`, calibration maximum error `0.000015`,
|
||||
coordinate boundary (`84` files) and server-spawn renderer `(32,48)/(3,12)`;
|
||||
coordinate mapper, golden fixtures, StreamingFocus and domain identity gates
|
||||
passed. Coordination and documentation gates passed; coordination reports
|
||||
only five already-expired M00 claim warnings.
|
||||
- Fidelity: closeout preserves five build-12340 coordinate observations, raw ADT
|
||||
evidence, pinned AzerothCore spawn mapping and cache-complete Northshire GUI
|
||||
evidence without claiming original-client visual parity or TrinityCore row
|
||||
equivalence.
|
||||
- Rebuild/migration: none. Coordinate contract remains version 2; fixture schema
|
||||
remains version 1; renderer cache formats are unchanged.
|
||||
- Remaining risks: recorded in M01 Evidence—TrinityCore populated spawn,
|
||||
placement Euler parity, native parser boundary and broader renderer parity.
|
||||
- Documentation: M01 target Evidence/checklist, target index and roadmap current
|
||||
state updated. Existing coordinate, identity and renderer module specs/API/
|
||||
diagrams were audited and passed the documentation gate.
|
||||
|
||||