# M01-QAR-INTEGRATOR-CLOSEOUT-001 — M01 milestone closeout ## Ownership - Target: M01 - Program: QAR - Owner/Agent ID: sindo-main-codex - Branch: `work/sindo-main-codex/m01-integrator-closeout` - Lease expires UTC: 2026-07-16 - Integrator: sindo-main-codex, continuing the user-directed milestone workflow on 2026-07-14 ## Outcome Audit every merged M01 work package on current `master`, record final evidence, close M01 and activate M02 only if all target verification and documentation criteria pass. ## Non-goals - Change coordinate, identity, streaming or renderer behavior. - Start M02 implementation. - Add new compatibility or visual-parity claims. - Commit proprietary assets, generated UIDs, caches or capture output. ## Paths - Exclusive: M01/M02 target status, M01 final Evidence and M01 claim acceptance markers - Shared/hotspots: `targets/README.md`, `targets/DEVELOPMENT_ROADMAP.md`, this claim - Generated/ignored: local Godot imports, renderer corpus and `user://` reports ## Contracts and data - Public APIs, schemas, cache formats and migrations: unchanged - Coordinate contract remains version 2 - Fixture schema remains version 1 - Consumers: milestone sequence and M02 work packages ## Dependencies - Requires: all seven M01 READY commits integrated through master `c8e99f2` - Blocks: M02 activation - External state: server-spawn GUI hashes and original-client numeric evidence are recorded; proprietary files remain outside Git ## Verification - Commands: all M01 domain/fixture/boundary/focus/identity/spawn gates, unified renderer dry-run, coordination/documentation checks and diff hygiene - Fidelity evidence: five build-12340 points, raw ADT metadata, pinned AzerothCore spawn and cache-complete GUI marker capture - Performance: no runtime change; preserve recorded renderer cold/warm evidence ## Documentation deliverables - M01 final target Evidence and checklist - M01 claim integration-acceptance markers - Target index and roadmap transition to M02 - API/module specifications and diagrams are audited, not changed unless a gap is found ## Simplicity and naming - Important names introduced: none beyond the closeout work-package ID - Simplest approach: evidence/status-only integrator patch - Rejected complexity: new one-off closeout framework or behavioral changes - Unavoidable complexity: none ## Status - State: ready-for-review - Done: accepted seven M01 packages, reran post-merge gates, recorded complete target Evidence, closed M01 and activated M02 - Next: merge closeout commit before starting an M02 implementation claim - Blocked by: ## Handoff - Commit: `dd412e6` - Branch: `work/sindo-main-codex/m01-integrator-closeout` - Outcome: M01 is `DONE` with all seven checklist items and complete Evidence; M02 is the only `ACTIVE` target and `targets/README.md` points to it. - Integration audit: all seven M01 READY commits are ancestors of master `c8e99f2`; their claims now carry `OPENWC_INTEGRATION:ACCEPTED` markers. - Verification: unified renderer dry-run passed project load, material/dedupe/ shutdown gates, manifest `7/7/7`, calibration maximum error `0.000015`, coordinate boundary (`84` files) and server-spawn renderer `(32,48)/(3,12)`; coordinate mapper, golden fixtures, StreamingFocus and domain identity gates passed. Coordination and documentation gates passed; coordination reports only five already-expired M00 claim warnings. - Fidelity: closeout preserves five build-12340 coordinate observations, raw ADT evidence, pinned AzerothCore spawn mapping and cache-complete Northshire GUI evidence without claiming original-client visual parity or TrinityCore row equivalence. - Rebuild/migration: none. Coordinate contract remains version 2; fixture schema remains version 1; renderer cache formats are unchanged. - Remaining risks: recorded in M01 Evidence—TrinityCore populated spawn, placement Euler parity, native parser boundary and broader renderer parity. - Documentation: M01 target Evidence/checklist, target index and roadmap current state updated. Existing coordinate, identity and renderer module specs/API/ diagrams were audited and passed the documentation gate.