4.6 KiB
4.6 KiB
M03-RND-WMO-RENDER-BUILD-PLANNER-001 — WMO render build step planner
Ownership
- Target: M03
- Program: RND
- Owner/Agent ID: sindo-main-codex
- Branch:
work/sindo-main-codex/m03-wmo-render-build-planner - Lease expires UTC: 2026-07-20
- Integrator: M03 milestone integrator
Outcome
Extract the pure one-operation WMO render build cursor decision from the loader while preserving mesh-before-MultiMesh ordering and one budget permit per group.
Non-goals
- Move Nodes, Resources, materials, jobs, queues, cancellation or permits.
- Change WMO placement, cache loading, transforms, visibility or shadows.
- Change build ordering, group names, editor ownership or finalization thread.
- Change cache formats, settings, presets or renderer diagnostics.
- Claim asset-backed WMO fidelity or p95/p99 acceptance.
Paths
- Exclusive:
src/render/wmo/wmo_render_build_step_planner.gd,src/tools/verify_wmo_render_build_step_planner.gd,docs/modules/wmo-render-build-step-planner.md, this claim - Shared/hotspots:
src/scenes/streaming/streaming_world_loader.gd,docs/modules/world-renderer.md,docs/modules/README.md,RENDER.md,targets/03-renderer-facade.md - Generated/ignored:
.godot, native DLL, generated ADT/WMO resources, caches and proprietary renderer corpus
Contracts and data
- Input: mesh count/index and MultiMesh count/index
- Output:
mesh,multimeshorcompleteoperation, selected index and next cursor values - Mesh is selected while its cursor is below count; MultiMesh is selected only after mesh exhaustion; complete follows both exhausted ranges
- Loader retains cursor adoption, Resource array access, Node creation, material refresh, ownership, queue cancellation and budget permit consumption
- Cache/schema/coordinate/profile versions: unchanged
Dependencies
- Requires: current master
1e73e59, accepted WMO placement registry/resolver - Blocks: further WMO render build state decomposition
- External state: none; verification uses scalar synthetic fixtures
Verification
- Commands: dedicated ordering/cursor/empty/raw-edge/source/timing verifier; WMO registry/resolver/material/shutdown plus M2/terrain/facade/internal-access/ manifest/scheduler/streaming/coordinate/docs/coord gates
- Fidelity evidence: exact mesh-first, one-step cursor behavior preserved
- Performance budget: 20,000 pure plans under 1 second; no Node, Resource, RID, task, queue, mutex, cache or file access
Documentation deliverables
- Inline public planner API documentation
- New module spec with inputs/outputs, data flow, sequence, ownership, failure/recovery, performance/fidelity limits and source map
- Renderer module registry, world renderer and
RENDER.mdupdates
Simplicity and naming
- Important name:
WmoRenderBuildStepPlanner - Simplest solution: one stateless function and three operation constants
- Rejected complexity: job class, iterator, generic cursor framework, callbacks, signals or ownership of engine objects
- Unavoidable complexity: loader still has separate mesh/MultiMesh materializers
- Measured optimization evidence: bounded synthetic planning loop
Status
- State: accepted
- Done: planner and loader adapter implemented; Node/Resource/material/job/queue/ permit ownership retained in loader; regressions, dry-run and docs passed
- Next: WMO build job/resource ownership or liquid service extraction
- Blocked by:
Handoff
- Commit:
3a6b1d3 - Results: dedicated planner PASS (
cases=9,iterations=20000,elapsed_ms=11.914); WMO registry/resolver/material/shutdown and 18 adjacent M2/terrain/facade/scheduler/streaming/coordinate regressions PASS; documentation and coordination gates PASS; checkpoint dry-run PASS7/7. - Remaining risks: no proprietary WMO corpus, original-client paired capture or traversal p95/p99; dry-run reports expected missing ADT/DBC/character assets; WMO Resource arrays and untyped build jobs/queues remain loader-owned.
- Documentation updated: inline planner API;
docs/modules/wmo-render-build-step-planner.md, module registry,docs/modules/world-renderer.md,RENDER.mdwith data-flow and sequence diagrams, ownership, failure/recovery and source map. - Integration: accepted in master merge
c06aed5; post-merge planner (cases=9,iterations=20000,elapsed_ms=11.059), WMO registry/resolver, runtime-cache shutdown, facade, documentation and coordination gates passed.