fc81059dfa
Work-Package: M01-QAR-INTEGRATOR-CLOSEOUT-001 Agent: sindo-main-codex
4.2 KiB
4.2 KiB
M01-QAR-INTEGRATOR-CLOSEOUT-001 — M01 milestone closeout
Ownership
- Target: M01
- Program: QAR
- Owner/Agent ID: sindo-main-codex
- Branch:
work/sindo-main-codex/m01-integrator-closeout - Lease expires UTC: 2026-07-16
- Integrator: sindo-main-codex, continuing the user-directed milestone workflow on 2026-07-14
Outcome
Audit every merged M01 work package on current master, record final evidence,
close M01 and activate M02 only if all target verification and documentation
criteria pass.
Non-goals
- Change coordinate, identity, streaming or renderer behavior.
- Start M02 implementation.
- Add new compatibility or visual-parity claims.
- Commit proprietary assets, generated UIDs, caches or capture output.
Paths
- Exclusive: M01/M02 target status, M01 final Evidence and M01 claim acceptance markers
- Shared/hotspots:
targets/README.md,targets/DEVELOPMENT_ROADMAP.md, this claim - Generated/ignored: local Godot imports, renderer corpus and
user://reports
Contracts and data
- Public APIs, schemas, cache formats and migrations: unchanged
- Coordinate contract remains version 2
- Fixture schema remains version 1
- Consumers: milestone sequence and M02 work packages
Dependencies
- Requires: all seven M01 READY commits integrated through master
c8e99f2 - Blocks: M02 activation
- External state: server-spawn GUI hashes and original-client numeric evidence are recorded; proprietary files remain outside Git
Verification
- Commands: all M01 domain/fixture/boundary/focus/identity/spawn gates, unified renderer dry-run, coordination/documentation checks and diff hygiene
- Fidelity evidence: five build-12340 points, raw ADT metadata, pinned AzerothCore spawn and cache-complete GUI marker capture
- Performance: no runtime change; preserve recorded renderer cold/warm evidence
Documentation deliverables
- M01 final target Evidence and checklist
- M01 claim integration-acceptance markers
- Target index and roadmap transition to M02
- API/module specifications and diagrams are audited, not changed unless a gap is found
Simplicity and naming
- Important names introduced: none beyond the closeout work-package ID
- Simplest approach: evidence/status-only integrator patch
- Rejected complexity: new one-off closeout framework or behavioral changes
- Unavoidable complexity: none
Status
- State: ready-for-review
- Done: accepted seven M01 packages, reran post-merge gates, recorded complete target Evidence, closed M01 and activated M02
- Next: merge closeout commit before starting an M02 implementation claim
- Blocked by:
Handoff
- Commit:
dd412e6 - Branch:
work/sindo-main-codex/m01-integrator-closeout - Outcome: M01 is
DONEwith all seven checklist items and complete Evidence; M02 is the onlyACTIVEtarget andtargets/README.mdpoints to it. - Integration audit: all seven M01 READY commits are ancestors of master
c8e99f2; their claims now carryOPENWC_INTEGRATION:ACCEPTEDmarkers. - Verification: unified renderer dry-run passed project load, material/dedupe/
shutdown gates, manifest
7/7/7, calibration maximum error0.000015, coordinate boundary (84files) and server-spawn renderer(32,48)/(3,12); coordinate mapper, golden fixtures, StreamingFocus and domain identity gates passed. Coordination and documentation gates passed; coordination reports only five already-expired M00 claim warnings. - Fidelity: closeout preserves five build-12340 coordinate observations, raw ADT evidence, pinned AzerothCore spawn mapping and cache-complete Northshire GUI evidence without claiming original-client visual parity or TrinityCore row equivalence.
- Rebuild/migration: none. Coordinate contract remains version 2; fixture schema remains version 1; renderer cache formats are unchanged.
- Remaining risks: recorded in M01 Evidence—TrinityCore populated spawn, placement Euler parity, native parser boundary and broader renderer parity.
- Documentation: M01 target Evidence/checklist, target index and roadmap current state updated. Existing coordinate, identity and renderer module specs/API/ diagrams were audited and passed the documentation gate.