79 lines
2.9 KiB
Markdown
79 lines
2.9 KiB
Markdown
# M00-QAR-FINAL-PAIRED-EVIDENCE-001 — Final paired evidence audit
|
|
|
|
<!-- OPENWC_CLAIM:M00-QAR-FINAL-PAIRED-EVIDENCE-001:sindo-main-codex:2026-07-14 -->
|
|
|
|
## Ownership
|
|
|
|
- Target: M00
|
|
- Program: QAR
|
|
- Owner/Agent ID: sindo-main-codex
|
|
- Branch: `work/sindo-main-codex/m00-final-paired-evidence`
|
|
- Lease expires UTC: 2026-07-14
|
|
- Integrator: milestone integrator
|
|
|
|
## Outcome
|
|
|
|
Produce one final WMO-ready paired report for all available build 12340 references and reconcile the remaining M00 acceptance gaps.
|
|
|
|
## Non-goals
|
|
|
|
- Achieving renderer parity inside M00.
|
|
- Calibrating unknown manual camera parameters.
|
|
- Marking the target DONE; only the milestone integrator may do so.
|
|
|
|
## Paths
|
|
|
|
- Exclusive: paired-run exit handling and final evidence record
|
|
- Shared/hotspots: renderer baseline/module findings
|
|
- Generated/ignored: final captures and reports under `user://`
|
|
|
|
## Contracts and data
|
|
|
|
- Public API/events: visual comparison exit 0/1 both count as completed report generation
|
|
- Schema/format version: unchanged
|
|
- Migration/compatibility: comparator infrastructure errors remain fatal
|
|
- Consumers: M00 integrator
|
|
|
|
## Dependencies
|
|
|
|
- Requires: merged region diagnostic and five private reference images
|
|
- Blocks: integrator decision on M00 completion
|
|
- External state: private images remain outside Git
|
|
|
|
## Verification
|
|
|
|
- Commands: complete paired baseline run, report audit, repository gates
|
|
- Fixtures: five build 12340 references
|
|
- Fidelity evidence: cold/warm comparison metrics and human gap classification
|
|
- Performance budget: existing M00 capture budgets
|
|
|
|
## Documentation deliverables
|
|
|
|
- Inline public API docs: PowerShell comparison step semantics
|
|
- Module specification: final evidence status
|
|
- Data-flow diagram: unchanged
|
|
- Sequence/state/dependency diagrams: unchanged
|
|
- Source map/status updates: baseline acceptance summary
|
|
|
|
## Simplicity and naming
|
|
|
|
- Important names introduced: `Invoke-GodotComparisonStep`
|
|
- Simplest considered solution: allow only comparator exit codes 0 and 1
|
|
- Rejected complexity/abstractions: suppressing all process failures
|
|
- Unavoidable complexity and justification: threshold exceedance is evidence, not infrastructure failure
|
|
- Measured optimization evidence: not applicable
|
|
|
|
## Status
|
|
|
|
- State: ready-for-review
|
|
- Done: paired-run exit contract fixed; full baseline and visual capture completed; ten pairs audited; final acceptance document written
|
|
- Next: integrator decides animated/sky reference policy and GUI RID-risk disposition
|
|
- Blocked by:
|
|
|
|
## Handoff
|
|
|
|
- Commit: this work-package commit
|
|
- Results: compared=10, failed=10, missing=0; mean error 0.066892..0.176952; cold/warm gaps stable; full workflow returned success with threshold evidence preserved
|
|
- Remaining risks: no build 12340 animated-M2 or sky-transition reference; GUI renderer RID/resources still reported at exit
|
|
- Documentation updated: `docs/M00_FINAL_PAIRED_EVIDENCE.md`, `docs/modules/world-renderer.md`
|